A prefabricated house being transported on the back of a flat-bed lorry caused tailbacks in both directions during this morning’s rush hour.
The lorry got stuck on the A379 at Harraton Cross.
Traffic started moving again around 8.45am

A prefabricated house being transported on the back of a flat-bed lorry caused tailbacks in both directions during this morning’s rush hour.
The lorry got stuck on the A379 at Harraton Cross.
Traffic started moving again around 8.45am
© 2026 – Iliffe Media Group Ltd, Winship Road, Milton, Cambridge, CB24 6PP
Comments
This article has no comments yet. Be the first to leave a comment.